United States › Grid › Interconnection queues › Indiana
BATTERY STORAGE · PJMBlue River Storage
Blue River Storage is a 300 MW battery storage request withdrawn in the PJM interconnection queue, in Shelby County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-297
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Developer
- Hecate Energy Blue River LLC
- Connection point (POI)
- Hanna-Tanners Creek 345 kV
- Location
- Shelby County, Indiana
- Technology
- Battery: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 29 September 2020
- Proposed online date
- December 2023
Location
Marker shows the centre of Shelby County; the queue data does not give exact sites.
Other requests in Shelby County
- Solar project J805, Shelby CountySolar · 199 MW · under construction
- Gas project J259, Shelby CountyGas · 1,065 MW · withdrawn
- Gas project J250, Shelby CountyGas · 999 MW · withdrawn
- Other project G088, Shelby CountyOther · 350 MW · withdrawn
- Solar + storage project J1756, Shelby CountySolar + storage · 309 MW · withdrawn
- Solar project J1829, Shelby CountySolar · 180 MW · withdrawn
- Battery storage project J1704, Shelby CountyBattery storage · 50.0 MW · withdrawn
- Solar project J1699, Shelby CountySolar · 43.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem