United States βΊ Grid βΊ Interconnection queues βΊ Kansas
SOLAR Β· SPPSolar project GEN-2018-062, Wyandotte County
Solar project GEN-2018-062, Wyandotte County is a 75.6 MW solar request withdrawn in the SPP interconnection queue, in Wyandotte County, Kansas, connecting to KACY.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2018 (completed)
- Withdrawn / abandonedFeb 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2018-062
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- KACY
- Connection point (POI)
- Nearman 161kV substation
- Location
- Wyandotte County, Kansas
- Technology
- Solar: 75.6 MW
- Total requested
- 75.6 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 May 2018
- Proposed online date
- October 2028
- Withdrawn
- February 2024
Location
Marker shows the centre of Wyandotte County; the queue data does not give exact sites.
Other requests in Wyandotte County
- Battery storage project GEN-2023-037, Wyandotte CountyBattery storage Β· 200 MW Β· in study
- Battery storage project GEN-2024-320, Wyandotte CountyBattery storage Β· 199 MW Β· in study
- Battery storage project GEN-2024-319, Wyandotte CountyBattery storage Β· 199 MW Β· in study
- Battery storage project ERAS-2025-029, Wyandotte CountyBattery storage Β· 170 MW Β· in study
- Other project ERAS-2025-031, Wyandotte CountyOther Β· 150 MW Β· in study
- Battery storage project GEN-2023-023, Wyandotte CountyBattery storage Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem