United States βΊ Grid βΊ Interconnection queues βΊ Kansas
BATTERY STORAGE Β· SPPBattery storage project GEN-2023-023, Wyandotte County
Battery storage project GEN-2023-023, Wyandotte County is a 200 MW battery storage request withdrawn in the SPP interconnection queue, in Wyandotte County, Kansas, connecting to KACY.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-023
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- KACY
- Connection point (POI)
- Center City 161 kV Substation
- Location
- Wyandotte County, Kansas
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- July 2028
- Withdrawn
- August 2025
Location
Marker shows the centre of Wyandotte County; the queue data does not give exact sites.
Other requests in Wyandotte County
- Battery storage project GEN-2023-037, Wyandotte CountyBattery storage Β· 200 MW Β· in study
- Battery storage project GEN-2024-320, Wyandotte CountyBattery storage Β· 199 MW Β· in study
- Battery storage project GEN-2024-319, Wyandotte CountyBattery storage Β· 199 MW Β· in study
- Battery storage project ERAS-2025-029, Wyandotte CountyBattery storage Β· 170 MW Β· in study
- Other project ERAS-2025-031, Wyandotte CountyOther Β· 150 MW Β· in study
- Solar project GEN-2018-062, Wyandotte CountySolar Β· 75.6 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem