United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR Β· SOUTHEASTSolar project 431, Scott County
Solar project 431, Scott County is a 175 MW solar request withdrawn in the Southeast interconnection queue, in Scott County, Mississippi, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 431
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Scott County, Mississippi
- Technology
- Solar: 175 MW
- Total requested
- 175 MW
- Queue status
- Withdrawn
- Entered queue
- 7 May 2020
Location
Marker shows the centre of Scott County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Scott County
- Battery storage project J4131, Scott CountyBattery storage Β· 100 MW Β· in study
- Solar project J1347, Scott CountySolar Β· 175 MW Β· built
- Solar + storage project J3680, Scott CountySolar + storage Β· 189 MW Β· withdrawn
- Gas project 230, Scott CountyGas Β· 150 MW Β· withdrawn
- Solar project J3714, Scott CountySolar Β· 95.0 MW Β· withdrawn
- Solar project IC-486, Scott CountySolar Β· 75.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem