SOLAR Β· SOUTHEASTSolar project IC-486, Scott County
Solar project IC-486, Scott County is a 75.0 MW solar request withdrawn in the Southeast interconnection queue, in Scott County, Mississippi, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2016 (completed)
- Withdrawn / abandonedMar 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-486
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Newton - Forest Industrial 115 kV Line
- Location
- Scott County, Mississippi
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 23 August 2016
- Withdrawn
- March 2017
Location
Marker shows the centre of Scott County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Scott County
- Battery storage project J4131, Scott CountyBattery storage Β· 100 MW Β· in study
- Solar project J1347, Scott CountySolar Β· 175 MW Β· built
- Solar + storage project J3680, Scott CountySolar + storage Β· 189 MW Β· withdrawn
- Solar project 431, Scott CountySolar Β· 175 MW Β· withdrawn
- Gas project 230, Scott CountyGas Β· 150 MW Β· withdrawn
- Solar project J3714, Scott CountySolar Β· 95.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem