United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

BATTERY STORAGE Β· WEST

Battery storage project Company IN, Washoe County

Battery storage project Company IN, Washoe County is a 100 MW battery storage request withdrawn in the West interconnection queue, in Washoe County, Nevada, connecting to NV Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Company IN
Grid region
West (non-ISO utilities)
Utility / transmission owner
NV Energy
Location
Washoe County, Nevada
Technology
Battery: 100 MW
Total requested
100 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
30 March 2018
Proposed online date
October 2021

Location

Marker shows the centre of Washoe County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Washoe County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem