πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wyoming

ONSHORE WIND Β· SPP

Onshore wind project GEN-2016-110, Platte County

Onshore wind project GEN-2016-110, Platte County is a 152 MW onshore wind request withdrawn in the SPP interconnection queue, in Platte County, Wyoming, connecting to BEPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandonedJan 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2020 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-110
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
BEPC
Connection point (POI)
Laramie River-Stegall 345 kV Line
Location
Platte County, Wyoming
Technology
Wind: 152 MW
Total requested
152 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 November 2016
Proposed online date
December 2020
Came online
December 2020
Withdrawn
January 2021

Location

Marker shows the centre of Platte County; the queue data does not give exact sites.

Power plants in Wyoming Β· Transmission lines in Wyoming

Other requests in Platte County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem