United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
ONSHORE WIND Β· MISOOnshore wind project G987, Brown County
Onshore wind project G987, Brown County is a 400 MW onshore wind request withdrawn in the MISO interconnection queue, in Brown County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2008 (completed)
- Withdrawn / abandonedNov 2008 (project stopped here)
- ConsentedNov 2008 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G987
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Kewaunee - North Appleton 345kV
- Location
- Brown County, Wisconsin
- Technology
- Wind: 400 MW
- Total requested
- 400 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 18 March 2008
- Agreement signed
- 12 November 2008
- Proposed online date
- December 2009
- Withdrawn
- November 2008
Location
Marker shows the centre of Brown County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Brown County
- Coal project G111, Brown CountyCoal Β· 85.0 MW Β· built
- Other project G322, Brown CountyOther Β· 10.0 MW Β· built
- Gas project G524, Brown CountyGas Β· 600 MW Β· withdrawn
- Other project G086, Brown CountyOther Β· 600 MW Β· withdrawn
- Gas project J294, Brown CountyGas Β· 588 MW Β· withdrawn
- Other project G131, Brown CountyOther Β· 500 MW Β· withdrawn
- Other project G001, Brown CountyOther Β· 255 MW Β· withdrawn
- Battery storage project J2211, Brown CountyBattery storage Β· 200 MW Β· withdrawn
- Onshore wind project G773, Brown CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project G421, Brown CountyOnshore wind Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem