United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
OTHER Β· MISOOther project G001, Brown County
Other project G001, Brown County is a 255 MW other request withdrawn in the MISO interconnection queue, in Brown County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 1995 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G001
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Brown County, Wisconsin
- Technology
- Other: 255 MW
- Total requested
- 255 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 8 November 1995
- Proposed online date
- November 2014
Location
Marker shows the centre of Brown County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Brown County
- Coal project G111, Brown CountyCoal Β· 85.0 MW Β· built
- Other project G322, Brown CountyOther Β· 10.0 MW Β· built
- Gas project G524, Brown CountyGas Β· 600 MW Β· withdrawn
- Other project G086, Brown CountyOther Β· 600 MW Β· withdrawn
- Gas project J294, Brown CountyGas Β· 588 MW Β· withdrawn
- Other project G131, Brown CountyOther Β· 500 MW Β· withdrawn
- Onshore wind project G987, Brown CountyOnshore wind Β· 400 MW Β· withdrawn
- Battery storage project J2211, Brown CountyBattery storage Β· 200 MW Β· withdrawn
- Onshore wind project G773, Brown CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project G421, Brown CountyOnshore wind Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem