ONSHORE WIND Β· MISOOnshore wind project G421, Brown County
Onshore wind project G421, Brown County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Brown County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2004 (completed)
- Withdrawn / abandonedDec 2004 (project stopped here)
- ConsentedDec 2004 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G421
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Wesmark - Finger Road 69kV
- Location
- Brown County, Wisconsin
- Technology
- Wind: 50.0 MW
- Total requested
- 50.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 22 March 2004
- Agreement signed
- 2 December 2004
- Proposed online date
- September 2005
- Withdrawn
- December 2004
Location
Marker shows the centre of Brown County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Brown County
- Coal project G111, Brown CountyCoal Β· 85.0 MW Β· built
- Other project G322, Brown CountyOther Β· 10.0 MW Β· built
- Gas project G524, Brown CountyGas Β· 600 MW Β· withdrawn
- Other project G086, Brown CountyOther Β· 600 MW Β· withdrawn
- Gas project J294, Brown CountyGas Β· 588 MW Β· withdrawn
- Other project G131, Brown CountyOther Β· 500 MW Β· withdrawn
- Onshore wind project G987, Brown CountyOnshore wind Β· 400 MW Β· withdrawn
- Other project G001, Brown CountyOther Β· 255 MW Β· withdrawn
- Battery storage project J2211, Brown CountyBattery storage Β· 200 MW Β· withdrawn
- Onshore wind project G773, Brown CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem