United States › Grid › Interconnection queues › Illinois
GAS · PJMGarden Prairie Energy Facility
Garden Prairie Energy Facility is a 350 MW gas request withdrawn in the PJM interconnection queue, in Boone County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2016 (completed)
- Withdrawn / abandonedMay 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB2-096
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Silver Lake-Cherry Valley
- Location
- Boone County, Illinois
- Technology
- Gas: 350 MW
- Total requested
- 350 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 27 April 2016
- Proposed online date
- April 2024
- Withdrawn
- May 2022
Location
Marker shows the centre of Boone County; the queue data does not give exact sites.
Other requests in Boone County
- Winnebago Energy CenterOther · 6.4 MW · built
- Garden Prairie Energy FacilityGas · 100 MW · withdrawn
- Onshore wind project T99, Boone CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project T148, Boone CountyOnshore wind · 100 MW · withdrawn
- Solar project AH1-047, Boone CountySolar · 58.6 MW · withdrawn
- Boone Heritage WFOnshore wind · 25.0 MW · withdrawn
- Solar project AC2-007, Boone CountySolar · 20.0 MW · withdrawn
- Cherry Valley Solar Project, LLCSolar · 12.5 MW · withdrawn
- Gas project AA2-067, Boone CountyGas · 10.0 MW · withdrawn
- Onshore wind project N20, Boone CountyOnshore wind · 9.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem