SOLAR Β· PJMSolar project AC2-007, Boone County
Solar project AC2-007, Boone County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Boone County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedJul 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC2-007
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Belvidere
- Location
- Boone County, Illinois
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 1 November 2016
- Proposed online date
- December 2017
- Withdrawn
- July 2018
Location
Marker shows the centre of Boone County; the queue data does not give exact sites.
Other requests in Boone County
- Winnebago Energy CenterOther Β· 6.4 MW Β· built
- Garden Prairie Energy FacilityGas Β· 350 MW Β· withdrawn
- Garden Prairie Energy FacilityGas Β· 100 MW Β· withdrawn
- Onshore wind project T99, Boone CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project T148, Boone CountyOnshore wind Β· 100 MW Β· withdrawn
- Solar project AH1-047, Boone CountySolar Β· 58.6 MW Β· withdrawn
- Boone Heritage WFOnshore wind Β· 25.0 MW Β· withdrawn
- Cherry Valley Solar Project, LLCSolar Β· 12.5 MW Β· withdrawn
- Gas project AA2-067, Boone CountyGas Β· 10.0 MW Β· withdrawn
- Onshore wind project N20, Boone CountyOnshore wind Β· 9.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem