ONSHORE WIND Β· PJMBoone Heritage WF
Boone Heritage WF is a 25.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Boone County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2005 (completed)
- Withdrawn / abandonedMar 2007 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- O07
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Poplar Grove 34.5kV
- Location
- Boone County, Illinois
- Technology
- Wind: 25.0 MW
- Total requested
- 25.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 1 March 2005
- Proposed online date
- June 2007
- Withdrawn
- March 2007
Location
Marker shows the centre of Boone County; the queue data does not give exact sites.
Other requests in Boone County
- Winnebago Energy CenterOther Β· 6.4 MW Β· built
- Garden Prairie Energy FacilityGas Β· 350 MW Β· withdrawn
- Garden Prairie Energy FacilityGas Β· 100 MW Β· withdrawn
- Onshore wind project T99, Boone CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project T148, Boone CountyOnshore wind Β· 100 MW Β· withdrawn
- Solar project AH1-047, Boone CountySolar Β· 58.6 MW Β· withdrawn
- Solar project AC2-007, Boone CountySolar Β· 20.0 MW Β· withdrawn
- Cherry Valley Solar Project, LLCSolar Β· 12.5 MW Β· withdrawn
- Gas project AA2-067, Boone CountyGas Β· 10.0 MW Β· withdrawn
- Onshore wind project N20, Boone CountyOnshore wind Β· 9.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem