BATTERY STORAGE Β· PJMBattery storage project AB1-078, Washington County
Battery storage project AB1-078, Washington County is a 2.0 MW battery storage request withdrawn in the PJM interconnection queue, in Washington County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2015 (completed)
- Withdrawn / abandonedMay 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB1-078
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Wilson 34.5kV
- Location
- Washington County, Pennsylvania
- Technology
- Battery: 2.0 MW
- Total requested
- 2.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 22 September 2015
- Proposed online date
- December 2016
- Withdrawn
- May 2016
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Washington County
- Cornerstone SolarSolar Β· 200 MW Β· in study
- Smith-Francis Junction 25 kVSolar Β· 20.0 MW Β· built
- Gaucho SolarSolar Β· 11.7 MW Β· built
- Gaucho SolarSolar Β· 8.3 MW Β· built
- Other project P34, Washington CountyOther Β· 6.4 MW Β· built
- Beech Hollow Energy CenterGas Β· 1,025 MW Β· withdrawn
- Gas project Z2-064, Washington CountyGas Β· 651 MW Β· withdrawn
- Gas project Y3-042, Washington CountyGas Β· 460 MW Β· withdrawn
- Coal project N40, Washington CountyCoal Β· 300 MW Β· withdrawn
- Beech HollowGas Β· 150 MW Β· withdrawn
- Gas project AA2-043, Washington CountyGas Β· 99.0 MW Β· withdrawn
- Gas project AE1-080, Washington CountyGas Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem