United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOMagruder Solar
Magruder Solar is a 20.0 MW solar request withdrawn in the NYISO interconnection queue, in Ulster County, New York, connecting to CHGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2018 (completed)
- Withdrawn / abandonedFeb 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 681
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CHGE
- Developer
- Granada Solar, LLC
- Connection point (POI)
- Modena - Galeville 115kV
- Location
- Ulster County, New York
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 2 January 2018
- Withdrawn
- February 2018
Location
Marker shows the centre of Ulster County; the queue data does not give exact sites.
Other requests in Ulster County
- Alcazar 2Battery storage Β· 150 MW Β· in study
- Lincoln Park DG, LLCBattery storage Β· 150 MW Β· in study
- Marlboro StorageBattery storage Β· 100 MW Β· in study
- Alcazar 1Battery storage Β· 100 MW Β· in study
- Kce NY 34Battery storage Β· 100 MW Β· in study
- Kce NY 5Battery storage Β· 94.0 MW Β· in study
- Magruder BESSBattery storage Β· 20.0 MW Β· in study
- Alcazar Energy StorageBattery storage Β· 250 MW Β· withdrawn
- NY New Paltz 540 State Rte 32 S StorageBattery storage Β· 221 MW Β· withdrawn
- Lincoln ParkBattery storage Β· 150 MW Β· withdrawn
- Pine Hill Energy StorageBattery storage Β· 120 MW Β· withdrawn
- Highland StorageBattery storage Β· 115 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem