SOLAR Β· SPPSolar project GEN-2017-067, Caddo County
Solar project GEN-2017-067, Caddo County is a 200 MW solar request withdrawn in the SPP interconnection queue, in Caddo County, Oklahoma, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2017 (completed)
- Withdrawn / abandonedDec 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2017-067
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Minco 345kV substation
- Location
- Caddo County, Oklahoma
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 May 2017
- Proposed online date
- December 2020
- Withdrawn
- December 2020
Location
Marker shows the centre of Caddo County; the queue data does not give exact sites.
Other requests in Caddo County
- Solar project GEN-2018-048, Caddo CountySolar Β· 300 MW Β· agreement signed
- Gas project GEN-2023-GR1, Caddo CountyGas Β· 97.5 MW Β· agreement signed
- Gas project GEN-2024-128, Caddo CountyGas Β· 690 MW Β· in study
- Onshore wind project GEN-2023-229, Caddo CountyOnshore wind Β· 230 MW Β· in study
- Solar project ERAS-2025-025, Caddo CountySolar Β· 175 MW Β· in study
- Solar + storage project GEN-2021-064, Caddo CountySolar + storage Β· 100 MW Β· in study
- Onshore wind project GEN-2016-091, Caddo CountyOnshore wind Β· 304 MW Β· built
- Onshore wind project GEN-2016-095, Caddo CountyOnshore wind Β· 200 MW Β· built
- Gas project GEN-2005-022, Caddo CountyGas Β· 177 MW Β· built
- Gas project GEN-2007-052, Caddo CountyGas Β· 150 MW Β· built
- Onshore wind project GEN-2011-010, Caddo CountyOnshore wind Β· 101 MW Β· built
- Onshore wind project GEN-2016-097, Caddo CountyOnshore wind Β· 100 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem