Battery storage project J1709, Grimes County

Battery storage project J1709, Grimes County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in Grimes County, Texas, connecting to ENTERGY TEXAS, INC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2022 (completed)
  2. Withdrawn / abandonedOct 2024 (project stopped here)
  3. ConsentedJan 2023 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1709
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY TEXAS, INC.
Connection point (POI)
138 kV Grimes
Location
Grimes County, Texas
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Withdrawn
Queue status
Withdrawn
Entered queue
21 January 2022
Agreement signed
18 January 2023
Proposed online date
February 2025
Withdrawn
October 2024

Location

Marker shows the centre of Grimes County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Grimes County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem