Battery storage project C3-152, Sevier County

Battery storage project C3-152, Sevier County is a 500 MW battery storage request withdrawn in the West interconnection queue, in Sevier County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C3-152
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Sigurd substation
Location
Sevier County, Utah
Technology
Battery: 500 MW
Total requested
500 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
15 May 2023
Proposed online date
May 2027

Location

Marker shows the centre of Sevier County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Sevier County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem