GAS Β· WESTGas project 403, Sevier County
Gas project 403, Sevier County is a 525 MW gas request withdrawn in the West interconnection queue, in Sevier County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2011 (completed)
- Withdrawn / abandonedMay 2020 (project stopped here)
- ConsentedMay 2020 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 403
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Sigurd substation
- Location
- Sevier County, Utah
- Technology
- Gas: 525 MW
- Total requested
- 525 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA signed May 6, 2014, terminated 5/27/2020
- Queue status
- Withdrawn
- Entered queue
- 25 October 2011
- Agreement signed
- 27 May 2020
- Proposed online date
- July 2014
- Withdrawn
- May 2020
Location
Marker shows the centre of Sevier County; the queue data does not give exact sites.
Other requests in Sevier County
- Battery storage project S0016, Sevier CountyBattery storage Β· 80.0 MW Β· agreement signed
- Geothermal project T2-004, Sevier CountyGeothermal Β· 20.0 MW Β· in study
- Solar project 589, Sevier CountySolar Β· 80.0 MW Β· built
- Battery storage project C3-152, Sevier CountyBattery storage Β· 500 MW Β· withdrawn
- Coal project 121, Sevier CountyCoal Β· 270 MW Β· withdrawn
- Solar project 602, Sevier CountySolar Β· 80.0 MW Β· withdrawn
- Solar + storage project C3-143, Sevier CountySolar + storage Β· 80.0 MW Β· withdrawn
- Geothermal project C4-003, Sevier CountyGeothermal Β· 20.0 MW Β· withdrawn
- Solar + storage project C3-093, Sevier CountySolar + storage Β· 19.9 MW Β· withdrawn
- Solar project C3-094, Sevier CountySolar Β· 19.9 MW Β· withdrawn
- Solar project 625, Sevier CountySolar Β· 1.0 MW Β· withdrawn
- Solar project 546, Sevier CountySolar Β· 0.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem