United States › Grid › Interconnection queues › Florida
BATTERY STORAGE · SOUTHEASTBattery storage project 379, Columbia County
Battery storage project 379, Columbia County is a 30.0 MW battery storage request built and operating in the Southeast interconnection queue, in Columbia County, Florida, connecting to Florida Power & Light.
Request details
- Queue ID
- 379
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Columbia-Suwannee (DEF) 115kV
- Location
- Columbia County, Florida
- Technology
- Battery: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 6 February 2020
- Came online
- November 2021
Location
Marker shows the centre of Columbia County; the queue data does not give exact sites.
Other requests in Columbia County
- Solar project 151, Columbia CountySolar · 74.5 MW · in study
- Solar project 152, Columbia CountySolar · 74.9 MW · built
- Solar project 148, Columbia CountySolar · 74.9 MW · built
- Solar project 169, Columbia CountySolar · 74.5 MW · built
- Battery storage project 617, Columbia CountyBattery storage · 200 MW · withdrawn
- Solar project 202A, Columbia CountySolar · 74.9 MW · withdrawn
- Solar project 153, Columbia CountySolar · 74.9 MW · withdrawn
- Solar project 441, Columbia CountySolar · 74.5 MW · withdrawn
- Solar project 435, Columbia CountySolar · 74.5 MW · withdrawn
- Solar project 440, Columbia CountySolar · 74.5 MW · withdrawn
- Solar project 170, Columbia CountySolar · 74.5 MW · withdrawn
- Solar project 436, Columbia CountySolar · 74.5 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem