SOLAR Β· SPPSolar project GEN-2021-089, Hockley County
Solar project GEN-2021-089, Hockley County is a 400 MW solar request withdrawn in the SPP interconnection queue, in Hockley County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedMay 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-089
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Tuco-Yoakum-Hobbs 345kV
- Location
- Hockley County, Texas
- Technology
- Solar: 400 MW
- Total requested
- 400 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 April 2021
- Proposed online date
- December 2026
- Withdrawn
- May 2022
Location
Marker shows the centre of Hockley County; the queue data does not give exact sites.
Other requests in Hockley County
- Solar project ERAS-2025-028, Hockley CountySolar Β· 384 MW Β· in study
- Onshore wind project GEN-2020-066, Hockley CountyOnshore wind Β· 254 MW Β· withdrawn
- Onshore wind project GEN-2016-056, Hockley CountyOnshore wind Β· 200 MW Β· withdrawn
- Gas project GEN-2008-131, Hockley CountyGas Β· 128 MW Β· withdrawn
- Onshore wind project GEN-2014-054, Hockley CountyOnshore wind Β· 120 MW Β· withdrawn
- Solar project GEN-2015-077, Hockley CountySolar Β· 80.0 MW Β· withdrawn
- Onshore wind project GEN-2014-053, Hockley CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Solar project GEN-2015-075, Hockley CountySolar Β· 51.5 MW Β· withdrawn
- Solar project GEN-2014-042, Hockley CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem