πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· SPP

Solar project GEN-2015-077, Hockley County

Solar project GEN-2015-077, Hockley County is a 80.0 MW solar request withdrawn in the SPP interconnection queue, in Hockley County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2015 (completed)
  2. Withdrawn / abandonedApr 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2015-077
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Tap Terry β€šΓ„Γ¬ Clauene 115kV transmission line approximately 5 miles South of Clauene
Location
Hockley County, Texas
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
29 September 2015
Proposed online date
December 2017
Withdrawn
April 2016

Location

Marker shows the centre of Hockley County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hockley County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem