United States βΊ Grid βΊ Interconnection queues βΊ Missouri
COAL Β· SPPCoal project GEN-2004-005, Greene County
Coal project GEN-2004-005, Greene County is a 275 MW coal request withdrawn in the SPP interconnection queue, in Greene County, Missouri, connecting to SPRM.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2004 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2004-005
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPRM
- Location
- Greene County, Missouri
- Technology
- Coal: 275 MW
- Total requested
- 275 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 9 February 2004
- Proposed online date
- March 2009
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Other requests in Greene County
- Battery storage project GEN-2024-175, Greene CountyBattery storage Β· 200 MW Β· in study
- Battery storage project GEN-2024-181, Greene CountyBattery storage Β· 199 MW Β· in study
- Gas project GEN-2024-088, Greene CountyGas Β· 145 MW Β· in study
- Coal project GEN-2006-019, Greene CountyCoal Β· 275 MW Β· built
- Solar project GEN-2018-018, Greene CountySolar Β· 57.0 MW Β· withdrawn
- Solar project GEN-2018-063, Greene CountySolar Β· 57.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem