Solar project GEN-2018-063, Greene County

Solar project GEN-2018-063, Greene County is a 57.0 MW solar request withdrawn in the SPP interconnection queue, in Greene County, Missouri, connecting to EDE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2018 (completed)
  2. Withdrawn / abandonedFeb 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-063
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
EDE
Connection point (POI)
Sedalia Marshfield Springfield Nichols Street 69kV circuit
Location
Greene County, Missouri
Technology
Solar: 57.0 MW
Total requested
57.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
23 October 2018
Proposed online date
December 2026
Withdrawn
February 2025

Location

Marker shows the centre of Greene County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Greene County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem