United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR Β· SPPSolar project GEN-2018-018, Greene County
Solar project GEN-2018-018, Greene County is a 57.0 MW solar request withdrawn in the SPP interconnection queue, in Greene County, Missouri.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2018 (completed)
- Withdrawn / abandonedJun 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2018-018
- Grid region
- SPP (Southwest Power Pool)
- Connection point (POI)
- 69kV ring bus interconnecting to Sedalia and Nichols Street
- Location
- Greene County, Missouri
- Technology
- Solar: 57.0 MW
- Total requested
- 57.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 8 May 2018
- Proposed online date
- November 2020
- Withdrawn
- June 2018
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Other requests in Greene County
- Battery storage project GEN-2024-175, Greene CountyBattery storage Β· 200 MW Β· in study
- Battery storage project GEN-2024-181, Greene CountyBattery storage Β· 199 MW Β· in study
- Gas project GEN-2024-088, Greene CountyGas Β· 145 MW Β· in study
- Coal project GEN-2006-019, Greene CountyCoal Β· 275 MW Β· built
- Coal project GEN-2004-005, Greene CountyCoal Β· 275 MW Β· withdrawn
- Solar project GEN-2018-063, Greene CountySolar Β· 57.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem