United States › Grid › Interconnection queues › Missouri
BATTERY STORAGE · SPPBattery storage project GEN-2024-181, Greene County
Battery storage project GEN-2024-181, Greene County is a 199 MW battery storage request in interconnection study in the SPP interconnection queue, in Greene County, Missouri, connecting to SPRM.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-181
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPRM
- Connection point (POI)
- Brookline 161 kV Substation
- Location
- Greene County, Missouri
- Technology
- Battery: 199 MW
- Total requested
- 199 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 1 March 2025
- Proposed online date
- January 2029
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Other requests in Greene County
- Battery storage project GEN-2024-175, Greene CountyBattery storage · 200 MW · in study
- Gas project GEN-2024-088, Greene CountyGas · 145 MW · in study
- Coal project GEN-2006-019, Greene CountyCoal · 275 MW · built
- Coal project GEN-2004-005, Greene CountyCoal · 275 MW · withdrawn
- Solar project GEN-2018-018, Greene CountySolar · 57.0 MW · withdrawn
- Solar project GEN-2018-063, Greene CountySolar · 57.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem