United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 285, Gulf County
Solar project 285, Gulf County is a 74.9 MW solar request built and operating in the Southeast interconnection queue, in Gulf County, Florida, connecting to Duke Energy Florida.
Request details
- Queue ID
- 285
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Ladybug Substation
- Location
- Gulf County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 29 April 2020
- Proposed online date
- March 2024
- Came online
- March 2024
Location
Marker shows the centre of Gulf County; the queue data does not give exact sites.
Other requests in Gulf County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem