United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

OTHER Β· SOUTHEAST

Other project 101, Gulf County

Other project 101, Gulf County is a 70.0 MW other request withdrawn in the Southeast interconnection queue, in Gulf County, Florida, connecting to Duke Energy Florida.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
101
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Masked
Connection point (POI)
Port St. Joe Substation
Location
Gulf County, Florida
Technology
Other: 70.0 MW
Total requested
70.0 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
28 September 2009
Proposed online date
January 2011

Location

Marker shows the centre of Gulf County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Gulf County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem