United States βΊ Grid βΊ Interconnection queues βΊ Florida
OTHER Β· SOUTHEASTOther project 101, Gulf County
Other project 101, Gulf County is a 70.0 MW other request withdrawn in the Southeast interconnection queue, in Gulf County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 101
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Connection point (POI)
- Port St. Joe Substation
- Location
- Gulf County, Florida
- Technology
- Other: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 28 September 2009
- Proposed online date
- January 2011
Location
Marker shows the centre of Gulf County; the queue data does not give exact sites.
Other requests in Gulf County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem