United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AF2-066, Preble County
Solar project AF2-066, Preble County is a 80.0 MW solar request withdrawn in the PJM interconnection queue, in Preble County, Ohio, connecting to Dayton.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2020 (completed)
- Withdrawn / abandonedSep 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-066
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Connection point (POI)
- West Manchester-Crown 69kV
- Location
- Preble County, Ohio
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 January 2020
- Proposed online date
- October 2022
- Withdrawn
- September 2024
Location
Marker shows the centre of Preble County; the queue data does not give exact sites.
Other requests in Preble County
- Angelina Solar ISolar Β· 80.0 MW Β· agreement signed
- Eaton OH SolarSolar Β· 49.9 MW Β· agreement signed
- Eaton OH SolarSolar Β· 20.0 MW Β· agreement signed
- Angelina Solar ISolar Β· 18.0 MW Β· agreement signed
- Solar project AI2-397, Preble CountySolar Β· 19.2 MW Β· in study
- Solar project AI2-398, Preble CountySolar Β· 9.6 MW Β· in study
- Solar project AF2-067, Preble CountySolar Β· 40.0 MW Β· withdrawn
- Preble Solar EnergySolar Β· 20.0 MW Β· withdrawn
- Solar project AE1-008, Preble CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AE1-007, Preble CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem