Preble Solar Energy is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Preble County, Ohio, connecting to Dayton.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2010 (completed)
- Withdrawn / abandonedJan 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W2-040
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Connection point (POI)
- Camden 69kV
- Location
- Preble County, Ohio
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 29 June 2010
- Proposed online date
- June 2018
- Withdrawn
- January 2020
Location
Marker shows the centre of Preble County; the queue data does not give exact sites.
Other requests in Preble County
- Angelina Solar ISolar Β· 80.0 MW Β· agreement signed
- Eaton OH SolarSolar Β· 49.9 MW Β· agreement signed
- Eaton OH SolarSolar Β· 20.0 MW Β· agreement signed
- Angelina Solar ISolar Β· 18.0 MW Β· agreement signed
- Solar project AI2-397, Preble CountySolar Β· 19.2 MW Β· in study
- Solar project AI2-398, Preble CountySolar Β· 9.6 MW Β· in study
- Solar project AF2-066, Preble CountySolar Β· 80.0 MW Β· withdrawn
- Solar project AF2-067, Preble CountySolar Β· 40.0 MW Β· withdrawn
- Solar project AE1-008, Preble CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AE1-007, Preble CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem