United States β€Ί Grid β€Ί Interconnection queues β€Ί Wyoming

ONSHORE WIND Β· WEST

Onshore wind project 290-C, Sweetwater County

Onshore wind project 290-C, Sweetwater County is a 50.4 MW onshore wind request withdrawn in the West interconnection queue, in Sweetwater County, Wyoming, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJun 2020 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
290-C
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Rock Springs-Point of Rocks line
Location
Sweetwater County, Wyoming
Technology
Wind: 50.4 MW
Total requested
50.4 MW
Service type
Energy only (ERIS)
Study phase
IA signed May 31, 2011, Terminated 6/23/2020
Queue status
Withdrawn
Entered queue
22 September 2009
Agreement signed
23 June 2020
Proposed online date
September 2022

Location

Marker shows the centre of Sweetwater County; the queue data does not give exact sites.

Power plants in Wyoming Β· Transmission lines in Wyoming

Other requests in Sweetwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem