United States › Grid › Interconnection queues › Wyoming
SOLAR · WESTSolar project 720, Sweetwater County
Solar project 720, Sweetwater County is a 80.0 MW solar request built and operating in the West interconnection queue, in Sweetwater County, Wyoming, connecting to PacifiCorp.
Request details
- Queue ID
- 720
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Developer
- Sweetwater Solar, LLC
- Connection point (POI)
- Raven substation
- Location
- Sweetwater County, Wyoming
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA signed 9/28/17
- Queue status
- Operational
- Entered queue
- 13 November 2015
- Agreement signed
- 28 September 2017
- Proposed online date
- December 2018
Location
Marker shows the centre of Sweetwater County; the queue data does not give exact sites.
Other requests in Sweetwater County
- Gas project T2-034, Sweetwater CountyGas · 600 MW · in study
- Gas project T2-033, Sweetwater CountyGas · 600 MW · in study
- Solar + storage project 661, Sweetwater CountySolar + storage · 1,000 MW · suspended
- Other project 607, Sweetwater CountyOther · 300 MW · suspended
- Other project 608, Sweetwater CountyOther · 300 MW · suspended
- Other project 609, Sweetwater CountyOther · 200 MW · suspended
- Coal project 267-B, Sweetwater CountyCoal · 22.0 MW · built
- Coal project 267-C, Sweetwater CountyCoal · 22.0 MW · built
- Coal project 267-A, Sweetwater CountyCoal · 22.0 MW · built
- Coal project 267-D, Sweetwater CountyCoal · 22.0 MW · built
- Gas project 2, Sweetwater CountyGas · 11.0 MW · built
- Onshore wind project C2-43, Sweetwater CountyOnshore wind · 600 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem