United States β€Ί Grid β€Ί Interconnection queues β€Ί Wyoming

ONSHORE WIND Β· WEST

Onshore wind project C2-43, Sweetwater County

Onshore wind project C2-43, Sweetwater County is a 600 MW onshore wind request withdrawn in the West interconnection queue, in Sweetwater County, Wyoming, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C2-43
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Bridger substation
Location
Sweetwater County, Wyoming
Technology
Wind: 600 MW
Total requested
600 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
28 April 2022
Proposed online date
December 2025

Location

Marker shows the centre of Sweetwater County; the queue data does not give exact sites.

Power plants in Wyoming Β· Transmission lines in Wyoming

Other requests in Sweetwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem