United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR Β· SPPSolar project GEN-2015-067, Noble County
Solar project GEN-2015-067, Noble County is a 150 MW solar request withdrawn in the SPP interconnection queue, in Noble County, Oklahoma, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2015 (completed)
- Withdrawn / abandonedJun 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2015-067
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Sooner 138 kV Substation
- Location
- Noble County, Oklahoma
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 7 October 2015
- Proposed online date
- October 2017
- Withdrawn
- June 2017
Location
Marker shows the centre of Noble County; the queue data does not give exact sites.
Other requests in Noble County
- Solar project GEN-2021-018, Noble CountySolar Β· 231 MW Β· agreement signed
- Battery storage project GEN-2021-019, Noble CountyBattery storage Β· 74.9 MW Β· agreement signed
- Battery storage project GEN-2025-SR8, Noble CountyBattery storage Β· 220 MW Β· in study
- Solar project GEN-2024-056, Noble CountySolar Β· 120 MW Β· in study
- Battery storage project GEN-2025-SR12, Noble CountyBattery storage Β· 116 MW Β· in study
- Battery storage project GEN-2025-SR11, Noble CountyBattery storage Β· 112 MW Β· in study
- Onshore wind project GEN-2015-047, Noble CountyOnshore wind Β· 300 MW Β· built
- Coal project GEN-2006-037, Noble CountyCoal Β· 900 MW Β· withdrawn
- Onshore wind project GEN-2021-071, Noble CountyOnshore wind Β· 403 MW Β· withdrawn
- Onshore wind project GEN-2008-111, Noble CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project GEN-2015-030, Noble CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2016-101, Noble CountyOnshore wind Β· 195 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem