United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
GAS Β· MISOGas project J435, Eau Claire County
Gas project J435, Eau Claire County is a 1,185 MW gas request withdrawn in the MISO interconnection queue, in Eau Claire County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2015 (completed)
- Withdrawn / abandonedApr 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J435
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Eau Clair substation at Arpin-Eau Clair 345 line
- Location
- Eau Claire County, Wisconsin
- Technology
- Gas: 1,185 MW
- Total requested
- 1,185 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 12 March 2015
- Proposed online date
- June 2019
- Withdrawn
- April 2017
Location
Marker shows the centre of Eau Claire County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Eau Claire County
- Hydro project G563, Eau Claire CountyHydro Β· 3.0 MW Β· built
- Hydro project G564, Eau Claire CountyHydro Β· 3.0 MW Β· built
- Hydro project G562, Eau Claire CountyHydro Β· 1.0 MW Β· built
- Gas project H004, Eau Claire CountyGas Β· 860 MW Β· withdrawn
- Onshore wind project J1366, Eau Claire CountyOnshore wind Β· 200 MW Β· withdrawn
- Other project G582, Eau Claire CountyOther Β· 0.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem