Gas project J435, Eau Claire County

Gas project J435, Eau Claire County is a 1,185 MW gas request withdrawn in the MISO interconnection queue, in Eau Claire County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2015 (completed)
  2. Withdrawn / abandonedApr 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J435
Grid region
MISO (Midcontinent)
Connection point (POI)
Eau Clair substation at Arpin-Eau Clair 345 line
Location
Eau Claire County, Wisconsin
Technology
Gas: 1,185 MW
Total requested
1,185 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
12 March 2015
Proposed online date
June 2019
Withdrawn
April 2017

Location

Marker shows the centre of Eau Claire County; the queue data does not give exact sites.