United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

OTHER Β· MISO

Other project G582, Eau Claire County

Other project G582, Eau Claire County is a 0.5 MW other request withdrawn in the MISO interconnection queue, in Eau Claire County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2005 (completed)
  2. Withdrawn / abandonedJan 2006 (project stopped here)
  3. ConsentedJan 2006 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G582
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Eau Claire County, Wisconsin
Technology
Other: 0.5 MW
Total requested
0.5 MW
Queue status
Withdrawn
Entered queue
29 December 2005
Agreement signed
11 January 2006
Proposed online date
April 2010
Withdrawn
January 2006

Location

Marker shows the centre of Eau Claire County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Eau Claire County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem