United States βΊ Grid βΊ Interconnection queues βΊ Michigan
BATTERY STORAGE Β· MISOBattery storage project J1103, Tuscola County
Battery storage project J1103, Tuscola County is a 20.0 MW battery storage request withdrawn in the MISO interconnection queue, in Tuscola County, Michigan, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedJun 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1103
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Bauer - (Kirk) - Ringle 345kV Line Tap
- Location
- Tuscola County, Michigan
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2021
- Withdrawn
- June 2020
Location
Marker shows the centre of Tuscola County; the queue data does not give exact sites.
Other requests in Tuscola County
- Battery storage project J4016, Tuscola CountyBattery storage Β· 300 MW Β· in study
- Solar project J3852, Tuscola CountySolar Β· 200 MW Β· in study
- Solar project J2578, Tuscola CountySolar Β· 180 MW Β· in study
- Onshore wind project J3743, Tuscola CountyOnshore wind Β· 176 MW Β· in study
- Solar project J4047, Tuscola CountySolar Β· 160 MW Β· in study
- Battery storage project J3636, Tuscola CountyBattery storage Β· 150 MW Β· in study
- Solar project J2490, Tuscola CountySolar Β· 125 MW Β· in study
- Surplus; J199/J202Other Β· 100 MW Β· in study
- Solar project J3470, Tuscola CountySolar Β· 100 MW Β· in study
- Onshore wind project J3336, Tuscola CountyOnshore wind Β· 41.8 MW Β· in study
- Onshore wind project J161, Tuscola CountyOnshore wind Β· 155 MW Β· built
- Onshore wind project J301, Tuscola CountyOnshore wind Β· 101 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem