United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J710, Lafayette Parish County
Solar project J710, Lafayette Parish County is a 20.0 MW solar request withdrawn in the MISO interconnection queue, in Lafayette Parish County, Louisiana, connecting to Entergy.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2016 (completed)
- Withdrawn / abandonedJan 2018 (project stopped here)
- ConsentedJan 2018 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J710
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Entergy
- Connection point (POI)
- Duson - Scott line 69kV
- Location
- Lafayette Parish County, Louisiana
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 9 September 2016
- Agreement signed
- 24 January 2018
- Proposed online date
- November 2018
- Withdrawn
- January 2018
Location
Marker shows the centre of Lafayette Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Lafayette Parish County
- Solar project J1818, Lafayette Parish CountySolar Β· 80.0 MW Β· agreement signed
- Gas project J4110, Lafayette Parish CountyGas Β· 400 MW Β· in study
- Battery storage project J4098, Lafayette Parish CountyBattery storage Β· 300 MW Β· in study
- Gas project J2791, Lafayette Parish CountyGas Β· 263 MW Β· in study
- Solar project J2888, Lafayette Parish CountySolar Β· 500 MW Β· withdrawn
- Solar project J645, Lafayette Parish CountySolar Β· 48.8 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem