United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

SOLAR Β· MISO

Solar project J710, Lafayette Parish County

Solar project J710, Lafayette Parish County is a 20.0 MW solar request withdrawn in the MISO interconnection queue, in Lafayette Parish County, Louisiana, connecting to Entergy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2016 (completed)
  2. Withdrawn / abandonedJan 2018 (project stopped here)
  3. ConsentedJan 2018 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J710
Grid region
MISO (Midcontinent)
Utility / transmission owner
Entergy
Connection point (POI)
Duson - Scott line 69kV
Location
Lafayette Parish County, Louisiana
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
9 September 2016
Agreement signed
24 January 2018
Proposed online date
November 2018
Withdrawn
January 2018

Location

Marker shows the centre of Lafayette Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Lafayette Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem