Onshore wind project 99, Meagher County

Onshore wind project 99, Meagher County is a 200 MW onshore wind request withdrawn in the West interconnection queue, in Meagher County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
99
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Near Ringling
Location
Meagher County, Montana
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Energy only (ERIS)
Study phase
Feasibility Study System Impact Study Facilities Study
Queue status
Withdrawn
Entered queue
16 September 2008
Proposed online date
December 2013

Location

Marker shows the centre of Meagher County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Meagher County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem