Onshore wind project 349, Meagher County

Onshore wind project 349, Meagher County is a 3.0 MW onshore wind request built and operating in the West interconnection queue, in Meagher County, Montana, connecting to NorthWestern Energy.

Queue statusOperating
  1. PlanningQueued Jul 2018 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2018 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
349
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
100kV line between Loweth and Two Dot at Groveland.
Location
Meagher County, Montana
Technology
Wind: 3.0 MW
Total requested
3.0 MW
Service type
Energy only (ERIS)
Study phase
Facility Study
Queue status
Operational
Entered queue
10 July 2018
Proposed online date
December 2018
Came online
December 2018

Location

Marker shows the centre of Meagher County; the queue data does not give exact sites.

Power plants in Montana · Transmission lines in Montana

Other requests in Meagher County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem