United States › Grid › Interconnection queues › Montana

ONSHORE WIND · WEST

Onshore wind project 46, Meagher County

Onshore wind project 46, Meagher County is a 10.0 MW onshore wind request built and operating in the West interconnection queue, in Meagher County, Montana, connecting to NorthWestern Energy.

Queue statusOperating
  1. PlanningQueued Jun 2006 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingSep 2007 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
46
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
100kV line between Loweth and Two Dot at Groveland.
Location
Meagher County, Montana
Technology
Wind: 10.0 MW
Total requested
10.0 MW
Service type
Energy only (ERIS)
Study phase
Feasibility System Impact Study System Impact Re-Study System Impact Re-Study Facility Study
Queue status
Operational
Entered queue
5 June 2006
Proposed online date
September 2007
Came online
September 2007

Location

Marker shows the centre of Meagher County; the queue data does not give exact sites.

Power plants in Montana · Transmission lines in Montana

Other requests in Meagher County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem