United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

SOLAR + STORAGE Β· MISO

Solar + storage project J2324, Winnebago County

Solar + storage project J2324, Winnebago County is a 35.0 MW solar + storage request withdrawn in the MISO interconnection queue, in Winnebago County, Illinois, connecting to AMERICAN TRANSMISSION COMPANY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2324
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMERICAN TRANSMISSION COMPANY
Connection point (POI)
Shirland Ave Tap (Y-54) to Shaw 69kV
Location
Winnebago County, Illinois
Technology
Solar: 35.0 MW Β· Battery
Total requested
35.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
8 September 2022
Proposed online date
February 2027
Withdrawn
July 2025

Location

Marker shows the centre of Winnebago County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Winnebago County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem