SOLAR + STORAGE Β· MISOSolar + storage project J2324, Winnebago County
Solar + storage project J2324, Winnebago County is a 35.0 MW solar + storage request withdrawn in the MISO interconnection queue, in Winnebago County, Illinois, connecting to AMERICAN TRANSMISSION COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2324
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMERICAN TRANSMISSION COMPANY
- Connection point (POI)
- Shirland Ave Tap (Y-54) to Shaw 69kV
- Location
- Winnebago County, Illinois
- Technology
- Solar: 35.0 MW Β· Battery
- Total requested
- 35.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 8 September 2022
- Proposed online date
- February 2027
- Withdrawn
- July 2025
Location
Marker shows the centre of Winnebago County; the queue data does not give exact sites.
Other requests in Winnebago County
- Solar project AH2-338, Winnebago CountySolar Β· 160 MW Β· in study
- Battery storage project AH1-564, Winnebago CountyBattery storage Β· 150 MW Β· in study
- Solar project AG2-516, Winnebago CountySolar Β· 120 MW Β· in study
- Rockford I Energy CenterGas Β· 40.0 MW Β· built
- Rockford II Energy CenterGas Β· 20.0 MW Β· built
- Rockford I Energy CenterGas Β· 20.0 MW Β· built
- Rockford II Energy CenterGas Β· 7.0 MW Β· built
- Rockford II Energy CenterGas Β· 6.0 MW Β· built
- Onshore wind project G902, Winnebago CountyOnshore wind Β· 1,500 MW Β· withdrawn
- Onshore wind project G901, Winnebago CountyOnshore wind Β· 600 MW Β· withdrawn
- Solar project AH1-234, Winnebago CountySolar Β· 224 MW Β· withdrawn
- Solar project AD2-102, Winnebago CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem