United States › Grid › Interconnection queues › New York
ONSHORE WIND · NYISORipley-Westfield Wind II
Ripley-Westfield Wind II is a 125 MW onshore wind request withdrawn in the NYISO interconnection queue, in Chautauqua County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2007 (completed)
- Withdrawn / abandonedOct 2007 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 258
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Babcock & Brown, LP
- Connection point (POI)
- Ripley - Dunkirk 230kV
- Location
- Chautauqua County, New York
- Technology
- Wind: 125 MW
- Total requested
- 125 MW
- Queue status
- Withdrawn
- Entered queue
- 24 September 2007
- Withdrawn
- October 2007
Location
Marker shows the centre of Chautauqua County; the queue data does not give exact sites.
Other requests in Chautauqua County
- South Ripley Solar and BESSSolar + storage · 270 MW · in study
- Lighthouse Energy StorageBattery storage · 250 MW · in study
- Basecamp BESSBattery storage · 170 MW · in study
- York Run SolarSolar · 90.0 MW · in study
- Dewdrop WindOnshore wind · 62.0 MW · in study
- Buttercup WindOnshore wind · 49.9 MW · in study
- Goldenrod WindOnshore wind · 39.0 MW · in study
- Cassadaga WindOnshore wind · 127 MW · built
- Cassadaga WindOnshore wind · 127 MW · built
- Ball Hill WindOnshore wind · 103 MW · built
- Ball Hill WindOnshore wind · 103 MW · built
- Arkwright SummitOnshore wind · 78.4 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem