United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AG2-244, Ashtabula County
Solar project AG2-244, Ashtabula County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Ashtabula County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-244
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Winfield-Presrite Corp 36 kV
- Location
- Ashtabula County, Ohio
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 16 March 2021
- Proposed online date
- January 2023
- Withdrawn
- December 2024
Location
Marker shows the centre of Ashtabula County; the queue data does not give exact sites.
Other requests in Ashtabula County
- Geneva Renewable Energy FacilityOther Β· 6.5 MW Β· built
- Coal project G482, Ashtabula CountyCoal Β· 1,200 MW Β· withdrawn
- Onshore wind project J124, Ashtabula CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project W1-070A_AT4, Ashtabula CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Gas project I02, Ashtabula CountyGas Β· 35.0 MW Β· withdrawn
- Solar project AG2-243, Ashtabula CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AH1-424, Ashtabula CountySolar Β· 19.2 MW Β· withdrawn
- Solar project AH2-073, Ashtabula CountySolar Β· 10.0 MW Β· withdrawn
- Solar project AH2-074, Ashtabula CountySolar Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem