United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

ONSHORE WIND Β· MISO

Onshore wind project J124, Ashtabula County

Onshore wind project J124, Ashtabula County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Ashtabula County, Ohio.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2010 (completed)
  2. Withdrawn / abandonedJun 2011 (project stopped here)
  3. ConsentedJun 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J124
Grid region
MISO (Midcontinent)
Connection point (POI)
Ashtabula 138 kV Substation
Location
Ashtabula County, Ohio
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
20 April 2010
Agreement signed
1 June 2011
Proposed online date
September 2011
Withdrawn
June 2011

Location

Marker shows the centre of Ashtabula County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Ashtabula County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem