United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
GAS Β· WESTGas project GI-1409, Emmons County
Gas project GI-1409, Emmons County is a 100 MW gas request withdrawn in the West interconnection queue, in Emmons County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2014 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-1409
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- AVS-Broadland 345kV
- Location
- Emmons County, North Dakota
- Technology
- Gas: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 19 June 2014
- Proposed online date
- May 2018
Location
Marker shows the centre of Emmons County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Emmons County
- Solar project J4077, Emmons CountySolar Β· 45.0 MW Β· in study
- Solar project J4070, Emmons CountySolar Β· 40.0 MW Β· in study
- Onshore wind project J302, Emmons CountyOnshore wind Β· 101 MW Β· built
- Onshore wind project J503, Emmons CountyOnshore wind Β· 98.8 MW Β· built
- Gas project GI-1407, Emmons CountyGas Β· 800 MW Β· withdrawn
- Gas project GI-1408, Emmons CountyGas Β· 800 MW Β· withdrawn
- Onshore wind project J779, Emmons CountyOnshore wind Β· 51.0 MW Β· withdrawn
- Onshore wind project J741, Emmons CountyOnshore wind Β· 51.0 MW Β· withdrawn
- Solar project J2084, Emmons CountySolar Β· 45.0 MW Β· withdrawn
- Solar project J2085, Emmons CountySolar Β· 40.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem