United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

SOLAR + STORAGE Β· PJM

Solar + storage project AG1-489, Lawrence County

Solar + storage project AG1-489, Lawrence County is a 175 MW solar + storage request withdrawn in the PJM interconnection queue, in Lawrence County, Pennsylvania, connecting to ATSI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedSep 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-489
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ATSI
Connection point (POI)
McClelland-Hoytdale 345 kV
Location
Lawrence County, Pennsylvania
Technology
Solar: 175 MW Β· Battery
Total requested
175 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study
Queue status
Withdrawn
Entered queue
30 September 2020
Proposed online date
June 2023
Withdrawn
September 2024

Location

Marker shows the centre of Lawrence County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Lawrence County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem