United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMFirefly Solar
Firefly Solar is a 202 MW solar request withdrawn in the PJM interconnection queue, in Lawrence County, Pennsylvania, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2019 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF1-146
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Hoytdale -McClelland 345 kV
- Location
- Lawrence County, Pennsylvania
- Technology
- Solar: 202 MW
- Total requested
- 202 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 18 September 2019
- Proposed online date
- September 2026
- Withdrawn
- December 2024
Location
Marker shows the centre of Lawrence County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Lawrence County
- Green Meadows SolarSolar Β· 40.0 MW Β· agreement signed
- Solar project AG2-236, Lawrence CountySolar Β· 20.0 MW Β· in study
- Solar project AH2-394, Lawrence CountySolar Β· 6.3 MW Β· in study
- Solar project AH2-389, Lawrence CountySolar Β· 6.0 MW Β· in study
- Hickory Run Energy StationGas Β· 1,000 MW Β· built
- New Castle Generating StationGas Β· 4.0 MW Β· built
- New Castle Generating StationGas Β· 1.0 MW Β· built
- Gas project Y1-015, Lawrence CountyGas Β· 1,000 MW Β· withdrawn
- Gas project Y1-070, Lawrence CountyGas Β· 825 MW Β· withdrawn
- Firefly SolarSolar Β· 200 MW Β· withdrawn
- Solar + storage project AG1-489, Lawrence CountySolar + storage Β· 175 MW Β· withdrawn
- Solar project AF2-253, Lawrence CountySolar Β· 70.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem