United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
SOLAR Β· SOUTHEASTSolar project 259, Allendale County
Solar project 259, Allendale County is a 48.0 MW solar request withdrawn in the Southeast interconnection queue, in Allendale County, South Carolina, connecting to Santee Cooper.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 259
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Allendale County, South Carolina
- Technology
- Solar: 48.0 MW
- Total requested
- 48.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 15 May 2024
- Proposed online date
- January 2004
Location
Marker shows the centre of Allendale County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Allendale County
- Other project 32, Allendale CountyOther Β· 19.9 MW Β· built
- Solar project 155, Allendale CountySolar Β· 86.0 MW Β· withdrawn
- Solar project 20171027001, Allendale CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 55, Allendale CountySolar Β· 75.0 MW Β· withdrawn
- Solar + storage project 279, Allendale CountySolar + storage Β· 65.0 MW Β· withdrawn
- Solar + storage project 20230829010, Allendale CountySolar + storage Β· 50.0 MW Β· withdrawn
- Solar project 40, Allendale CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem