Solar project 155, Allendale County

Solar project 155, Allendale County is a 86.0 MW solar request withdrawn in the Southeast interconnection queue, in Allendale County, South Carolina, connecting to Santee Cooper.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
155
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Santee Cooper
Location
Allendale County, South Carolina
Technology
Solar: 86.0 MW
Total requested
86.0 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
27 July 2020
Proposed online date
December 2023

Location

Marker shows the centre of Allendale County; the queue data does not give exact sites.

Power plants in South Carolina Β· Transmission lines in South Carolina

Other requests in Allendale County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem